Research on factors affecting domestic tourists' satisfaction with ecotourism in Ben Tre province - 21


N

327

327

327

327

327

327

327

327

Maybe you are interested!

**. Correlation is significant at the 0.01 level (2-tailed).


*. Correlation is significant at the 0.05 level (2-tailed).


V RESULTS OF REGRESSION ANALYSIS


Descriptive Statistics



Mean

Std. Deviation

N

COMMITMENT

3,7339

,51727

327

PCDL

3,6905

,78849

327

Infrastructure

3,6590

,97197

327

Tour guide

3.6346

,83184

327

ATTT

3,5015

,75044

327

AUMS

3,3639

1.02547

327

TQVCGT

3,6078

1.03210

327

CPDV

3,6361

,62279

327



Correlations



ORANGE

FACE

PCDL

Infrastructure

Tour guide

ATTT

AUMS

TQVCGT

CPDV


COMMITMENT

1,000

,646

,604

,448

,568

,599

,552

,449


PCDL

,646

1,000

,479

,370

,443

,386

,357

,251


Infrastructure

,604

,479

1,000

,392

,452

,498

,519

,279


Pearson Correlation

Tour guide

,448

,370

,392

1,000

,386

,120

,239

,263

ATTT

,568

,443

,452

,386

1,000

,529

,405

,249


AUMS

,599

,386

,498

,120

,529

1,000

,546

,253


TQVCGT

,552

,357

,519

,239

,405

,546

1,000

,277


CPDV

,449

,251

,279

,263

,249

,253

,277

1,000


COMMITMENT

.

,000

,000

,000

,000

,000

,000

,000


PCDL

,000

.

,000

,000

,000

,000

,000

,000


Infrastructure

,000

,000

.

,000

,000

,000

,000

,000


Sig. (1-tailed)

Tour guide

,000

,000

,000

.

,000

,015

,000

,000


ATTT

,000

,000

,000

,000

.

,000

,000

,000


AUMS

,000

,000

,000

,015

,000

.

,000

,000


TQVCGT

,000

,000

,000

,000

,000

,000

.

,000


CPDV

,000

,000

,000

,000

,000

,000

,000

.

N

COMMITMENT

327

327

327

327

327

327

327

327


PCDL

327

327

327

327

327

327

327

327

Infrastructure

327

327

327

327

327

327

327

327

Tour guide

327

327

327

327

327

327

327

327

ATTT

327

327

327

327

327

327

327

327

AUMS

327

327

327

327

327

327

327

327

TQVCGT

327

327

327

327

327

327

327

327

CPDV

327

327

327

327

327

327

327

327


Variables Entered/Removed a


Model

Variables Entered

Variables Removed

Method

1

CPDV, ATTT, HDV, TQVCGT, PCDL, CSHT, AUMS b

.

Enter

a. Dependent Variable: CAMNHAN

b. All requested variables entered.


Model

R

R

Square

Adjuste d R Square

Std.

Error of the Estimate

Change Statistics

Durbin-Watson

R

Square Change

F

Change

df1

df2

Sig. F Change

1

, 828a

,686

,679

,29317

,686

99,415

7

319

,000

1,639

a. Predictors: (Constant), CPDV, ATTT, HDV, TQVCGT, PCDL, CSHT, AUMS


b. Dependent Variable: CAMNHAN


Model

Unstandardized Coefficients

Standardized Coefficients

t

Sig.

Collinearity Statistics

B

Std.

Error

Beta

Tolerance

VIF

(Constant)

1,012

,118


8,549

,000



PCDL

,203

,025

,310

8,092

,000

,671

1,490

Infrastructure

,065

,022

,123

2,905

,004

,552

1,812

Tour guide

,088

,023

,141

3,776

,000

,709

1,410

1








ATTT

,070

,028

,102

2,487

,013

,585

1,709

AUMS

,118

,022

,234

5,403

,000

,527

1,898

TQVCGT

,063

,020

,125

3,094

,002

,606

1,650

CPDV

,150

,028

,181

5,335

,000

,859

1,165


a. Dependent Variable: CAMNHAN




Value

Condition Index

Variance Proportions

Model

Dimension

session

(Const ant)


PCDL


Infrastructure


Tour guide


ATTT


AUMS

TQ VCGT


CPDV


1

7,764

1,000

,00

,00

,00

,00

,00

,00

,00

,00


2

,073

10,294

,02

,01

,01

,11

,00

,25

,11

,02


3

,040

13,910

,03

,00

,22

,06

,04

,25

,31

,04


4

,036

14,630

,04

,05

,23

,03

,03

,04

,43

,13

1













5

,028

16,698

,02

,07

,30

,35

,19

,01

,07

,12


6

,025

17,527

,00

,77

,15

,07

,00

,07

,07

,09


7

,020

19,743

,01

,06

,08

,37

,67

,37

,00

,00


8

,013

24,265

,88

,04

,01

,00

,06

,01

,00

,60


a. Dependent Variable: CAMNHAN




Comment


Agree Privacy Policy *