Mathematical programming - Ngo Huu Tam - 16

Step 1 Find the initial PACB using the minimum cost method as follows:  Assign 40 tons to cell (3,4), point A 3 20 tons left, delete column B 4 .  Assign 20 tons to cell (2,1), point A 2 Only 20 tons left, delete column B 1 .  Assign 30 tons to cell (1,2), delete row A 1 and column B 2 . ...

Content and Mathematical Model of the Problem.

Machine CN A 10 B 25 C 25 Type I: 30 50 45 30 Type II: 20 40 42 28 Type III: 10 - 38 25 How to assign workers to operate machines so that the total number of products made in an hour is the largest, knowing that type III workers cannot operate machine A. a) Model the problem. b) Solve the problem. ...