Factors affecting the progress of construction investment projects of Saigon Tourist Corporation - 15

I


COMMITMENT


I hereby certify that this is my own research work. The data and results presented in this thesis are true and have never been published in any other research work.

Maybe you are interested!

I certify that any help received in preparing this thesis and all sources used have been fully acknowledged in this thesis.


Factors affecting the progress of construction investment projects of Saigon Tourist Corporation - 15

Students doing thesis


Nguyen Hong Hai Phuoc

II


THANK YOU


In the process of completing this thesis, I have received guidance and help from teachers, colleagues and students. With deep respect and gratitude, I would like to express my sincere thanks to:

The Department of Civil and Industrial Construction Engineering, Ho Chi Minh City University of Technology has created all favorable conditions to help me during my study and thesis completion.

Dr. Tran Quang Phu, my beloved teacher, guided, helped, encouraged and created all favorable conditions for me throughout my study and thesis writing process.

I would like to sincerely thank the teachers in the thesis evaluation board for giving me valuable contributions to complete this thesis.

During the implementation process, although I tried my best to complete the thesis, exchanged and received comments from teachers and friends, and consulted

Many documents, but inevitably there are errors. We look forward to receiving comments from teachers and readers.

I would like to thank my friends, colleagues and brothers and sisters working in the construction industry for helping me have survey data for my graduation thesis.

Thank you very much!


Ho Chi Minh City, date……month……year 2017.

Thesis author


Nguyen Hong Hai Phuoc

III


SUMMARY


Project progress is one of the factors that play an important role in the success of the project. The problem of delay in construction investment projects is an issue that is always of great concern to the state and society. There have been a number of studies on the progress of construction projects in Vietnam as well as in the world, however, these studies focus mainly on the group of traffic works or high-rise buildings. In the trend of international integration of the country, the tourism industry is focused on development, promoting the development of infrastructure of the tourism industry is of interest, a series of construction works in the tourism industry are strongly deployed. Therefore, this topic is carried out to identify the main factors and propose a number of solutions to contribute to limiting the factors affecting the progress of construction investment projects of Saigon Tourist Corporation.

Based on previous studies combined with theoretical documents on the role of progress in project success and factors affecting project progress, plus the current status of construction investment projects under Saigon Tourist Corporation; the author has identified 24 factors affecting the progress of construction investment projects under Saigon Tourist Corporation. Through the survey, 130 valid responses were collected for analysis. The analysis results found 21 factors that were reduced to 6 main groups of factors related to the progress of construction investment projects of Saigon Tourist Corporation: 1. " Investor" group , 2. "Project characteristics" group , 3. "Contractor capacity" group , 4. " Landscape and law in the tourism sector" group , 5. "Consultant capacity" group , 6. "External" group .

Based on the 6 groups of factors just identified, the author conducted a linear regression method to find out the level of influence of each group of factors on the progress of construction investment projects under Saigon Tourism Corporation. The results showed that the group of " Investors" had the strongest influence on the progress of construction investment projects under Saigon Tourism Corporation. From the above results, the author consulted experts to propose a number of solutions to limit the factors affecting the progress of construction investment projects under Saigon Tourism Corporation.

IV


ABSTRACT


Project schedule plays an important part in the success of such. Being delayed in investment projects is a hot topic concerning by the Government and the society. There have been researches regarding project construction schedule in Vietnam as well as other countries, however, these focus on high rise buildings or circulation projects. Harmonizing with the globalization, the hospitality industry gains the foremost devotion for improvement, developments considered for hospitality infrastructures are being, many new projects being constructed rapidly. Therefore, this topic is researched to investigate the main factors and propose solutions to minimize the impact of those factors affecting project schedules of those investments of SaigonTourist Holding Company.

Built upon the base of previous researches and factors affecting project schedules, along with the actual experiences from the investments of SaigonTourist Holding Company, the author has pinned down 24 factors through which 21 were derived from the results of 130 questionnaires that had been grouped into 6 categories. Including: 1. “Investor” , 2. “Project Specifications” , 3. “Contractors' capabilities” , 4. “Hospitality floor plan and statutory” , 5. “Consultants' capabilities” , 6. “Others” .

From the above six categories, the author had performed a linear regression to see which has the most impact on the project schedule and such indicates that the “Investor” group has the most impact on the project schedule. From such outcome, the author suggests solutions that would minimize the impacts of those factors.

V


LIST OF TABLES

Page

Table 1.1: Classification of investment projects in the tourism sector 13

Table 2.1: Summary of previous studies 42

Table 2.2 Construction status of Saigon Tourist Corporation 44

Table 2.3: Level of impact 48

Table 2.4 Factors affecting the progress of construction investment projects of Saigon Tourist Corporation 52

Table 3.1 Table of mean values ​​and standard deviations of 24 experimental observation variables 60

Table 3.2: Cronbach's Alpha coefficient, total item correlation coefficient of 24 experimental observed variables 61

Table 3.3: Proportion by type of project the survey subjects participated in 63

Table 3.4: Percentage of years of experience of survey subjects 64

Table 3.5: Role ratio of survey subjects 65

Table 3.6: Percentage of job positions of survey subjects 66

Table 3.7 Percentage of projects that the survey subjects participated in 67

Table 3.8 Cronbach's Alpha coefficient test 68

Table 3.9: Checking Cronbach's Alpha coefficient after removing observed variables with total correlation coefficients less than 0.3 69

Table 3.10 KMO value and Bartlett's Test 70

Table 3.11: Percentage explained by factors and total variance extracted .. 71 Table 3.12: Factor loading values ​​of factors on main factors 72

Table 3.13: KMO and Bartlett's Test values ​​after removing variable YT518 73

Table 3.14: Percentage explained by factors and total variance extracted after removing variable YT518 73

Table 3.15: Factor loading values ​​of factors on main factors after removing variable YT518 74

Table 3.16: Results of factor analysis 75

Table 3.17: Factors affecting the progress of construction investment projects of Saigon Tourist Corporation 76

VI

Table 3.18: Linear correlation matrix 79

Table 3.19 Summary model when using the enter 80 method

Table 3.20 Regression results after using the enter 80 method

VII

LIST OF IMAGES

Page

Figure 1.1 Project implementation process 14

Figure 1.2: WBS creation sequence 21

Figure 1.3: Pert Diagram (Two Jobs in a Row) 26

Figure 1.4: Pert Diagram (Two Converging Jobs) 27

Figure 1.5: Pert Diagram (Two jobs performed simultaneously) 27

Figure 1.6 Pert Diagram (Dummy Work (Variable) 27

Figure 1.7: GANTT chart 30

Figure 1.8: Progress of line 31

Figure 2.1: Research process 39

Figure 2.2: Questionnaire design process 41

Figure 3.1: Proportion chart by project type that the survey respondents participated in 63

Figure 3.2: Proportion chart by years of experience of survey participants 64

Figure 3.3: Proportion chart by role of survey participants 65

Figure 3.4: Proportion chart by job position that the survey respondents participated in 66

Figure 3.5: Proportion chart by number of projects that the survey respondents participated in 67

Figure 3.6: Proposed research model 78

Figure 4.1: Factors affecting the progress of construction investment projects of Saigon 86 Tourism Corporation

VIII


LIST OF ABBREVIATIONS


o Investor : Investor

o DA : Project

o CSVCKTHT : Technical infrastructure facilities

o CSVCKTHTDL : Technical facilities and tourism infrastructure

o QLDA : Project Management

o TVTK : Design consultancy

o TVGS : Supervision consultant

o XD : Construction

Comment